How to finish the house

Interior decoration of the house is considered a laborious and complex process. In order for the results of the work to be qualitative, it is necessary to observe some of their sequence. Finishing the house is divided into rough and finish. The purpose of the first is to eliminate the disadvantages of floor, walls and ceiling. Proceed to its implementation can only be after dismantling unnecessary structures, cleaning the area of the premises and erecting all the partitions. Even before the beginning of roughing it is necessary to determine:

  • Place of future location of switches and sockets, equipment, electrical appliances, wall and ceiling lamps, computer, TV, telephone.
  • Type and size of interior doors.
  • Type, model, as well as the location of the installation of sanitary equipment.
  • Type, type of material for finishing ceilings and walls.
  • Type of floor covering for all rooms.

Particular attention should be paid to laying the warm floor. It is more suitable for decoration from tile or porcelain tiles. These materials best conduct heat. Screed is carried out using dry modified mixtures. In places where furniture will always be standing, there is no need for a warm floor.

When choosing materials for roughing, you should immediately take into account the quality and Properties of finishing coatings. For example, for a floor in different rooms different material is used. Tile, deck board, carpet have a different coefficient of expansion, thickness, as well as a way of laying. To ensure that the floor surface is flat, you need to consider all these factors, determining the height of the screed. It is clear that the finish of the house is done, starting with the ceilings. There are some peculiarities here. Ceilings that have a deviation from the horizon not more than 3 cm are leveled with putty. With a larger slope, plasterboard is used.

The finishing of the house in the second stage is the leveling and filling of the walls. For leveling, special mixtures or coarse fillers are used. After that, irregularities remain on the surface. Their depth should not exceed 3 mm. They are eliminated by putty. Depending on the finish coatings, the volume of shpatlevochnyh work fluctuates. If the walls are prepared for painting, then shpatlyuyut 3-4 times. If under the textured wallpaper, it is enough and 2 times. Primer - the final stage of roughing the walls. After it, the surfaces are less susceptible to deformation.

Construction, finishing of houses is a long process. But when performing rough work there should be no rush and fuss. This is fraught with financial and time costs. It is necessary that each applied layer is well dried. Then the connection with the next, whether it be putty, plaster, primer, will become strong. Categorically, it is not possible to artificially dry or leave the building mixtures under direct sunlight. This will lead to internal stress and cracking of the surfaces.

If the house with a rough finish was invested with enough money, and the work itself was done without haste and bustle, then the finishing will be easier and faster. And for many years you will not have to remember the repairs.