Is it possible to put tiles on the tiles during repair?

Beginning to revet the walls and the floor of the bathroom, many people ask a question: "Can I put the tiles on the tiles without removing the old one?" To begin with, find out what exactly is at stake. If this is a ceramic tile, then it should be noted that this finishing material is considered to be the most moisture resistant and use it better in rooms with excessive humidity. Waterproofing tile makes it irreplaceable when facing not only the walls of shower rooms and bathrooms, kitchen work areas and countertops, but also when using this material as a floor covering.

Can I put tiles on the tiles when facing the walls?

The tile is laid almost on any surface, with a special role played by the material from which it is made. However, when facing the walls to the question of the townsfolk: "So, can you put the tiles on the tiles?" The answer of experts will be categorical: "You can not!"

The fact is that the surface of the tile has a very low adhesion coefficient. That is, the probability of its strong connection with other material is practically zero. Thus, having a lot of weight, the tiles on the vertical wall will not hold and will surely fall.

Floor covering: can I put the tile on the tile?

But if you use tiles in the bathroom or toilet, then such manipulations are possible. However, for best results in this case it is recommended to use a special primer. It includes not only sand and cement, but also additional binders that guarantee the best grip. Today you can easily purchase a primer of any price category of domestic or foreign production.

How to put the tile on the floor in the bathroom?

To perform this work, two methods of fixing are used: with cement mortar and using glue. The second option is considered to be less time consuming and much more practical. So, let's talk about how to glue the tile on the floor, and what you need for this.

At the beginning of the work, it is necessary to properly clean the surface of the old tile from dirt and degrease it properly. Then, using a paint roller or brush, apply the primer immediately to the entire surface. The consumption of the material necessary for work can be calculated in advance. As a rule, it is equal to 300 g per 1 square meter of the floor surface.

After applying the primer, you must wait for it to dry completely. Usually it takes about three hours. Then you can start the process of laying the tile on the floor. To do this, the previously prepared adhesive should be applied to the surface of the tile with a notched trowel, after which it must be pressed firmly against the floor. Once all the tiles are laid, you need to work the seams, that is, with a rubber spatula, evenly apply a special grout to the joints of the tiles. After it dries, the floor must be wiped with a damp soft cloth or sponge. Fitted with glue, the floor tiles will be ready for use after two days.