HomelinessBuilding

How to make concrete

In the current economic situation, it can be difficult for many to hire a team to build an apartment building, and they are trying to do as much as they can on their own. And for this you need to know the basic principles of construction work, including how to make concrete.

It's no secret that the quality of the prepared mortar will have a significant impact on the durability and reliability of the erected building or the flooded path. If you make a mistake in choosing the consistency or in the proportions of the components to be mixed, you will soon be able to assess the consequences of your oversight: cracks will appear in the walls, the path will begin to crumble.

To tell in more detail about how to make concrete, it is necessary to specify the composition of the components that enter the solution. In addition to cement, it is necessary to prepare a sufficient amount of sand, gravel and water. When making purchases, pay special attention to the date of manufacture and packaging of components. If cement has long expired, its properties will not match the claimed. Therefore, you can not achieve the desired strength and durability of the finished stone.

Also it is necessary to acquire the necessary equipment: a concrete mixer or a container with a shovel. Everyone who knows how to make concrete, and many times applied this knowledge in practice, will advise you to take the container more spaciously. Its dimensions should allow you to mix the prepared components with a shovel without touching the walls. At the same time, do not abuse the size, because otherwise it will be very difficult for you to do this job.

After you have purchased everything you need, and the preparatory part is completed, you can begin to perform the basic work. And for this we will dwell in more detail on how concrete is made by our own hands.

Here the importance of the mixing components becomes important, as it directly affects the quality of the work performed. Before starting work, remove all foreign substances from the sand and gravel, if they were stored unopened in the open air. The proportion of concrete in the first place depends on the brand of cement used. In this case, according to experts, if you bought a cement 500, you need to prepare 5 buckets of sand, if the cement 400 - 4 buckets, and for cement 300 will be enough three buckets.

Many add gravel to the solution. It replaces the fourth part of the sand. The sequence of work in this case should be as follows:

  • Mixed part of sand and gravel;
  • A little cement is added;
  • Everything is thoroughly mixed;
  • The remaining parts of the components are introduced;
  • Everything is again very carefully mixed;
  • Water is added.

The last stage raises a lot of questions. According to experts, the solution should have a consistency of thick sour cream. At the same time, the amount of water to be injected must be kept to a minimum so as to avoid the formation of small cracks and holes on the surface of the foundation, wall or track.

If the foundation of the structure you are building will be subjected to shock and dynamic loads, then in the prepared mortar it is worth adding a little bit of clay. This will make it more plastic.

Now you know how to make concrete. I hope this knowledge will help you to realize your dream, and very soon you will rest on your own spacious cottage, live in a beautiful cottage or stroll along beautiful paths. It would seem that the tracks are not so important for our comfortable existence. But as soon as you make them with your own hands, you can feel certain changes that will inevitably come into your life. It is not difficult to make concrete with your own hands, you just need to strictly follow all recommendations.

Similar articles

 

 

 

 

Trending Now

 

 

 

 

Newest

Copyright © 2018 en.delachieve.com. Theme powered by WordPress.