The installation of door frames must be carried out very carefully. The main feature of the installation are flat vertical and horizontal sides. Thanks to this principle, the door will last for a long time, it will not warp, and the loops will not creak.
Types of installations
The installation of the door boxes begins at the end of the finishing work not only on the wall and ceilings, but also on the floor, that is where the floor covering has already been laid. But until the moment when the walls will be painted or wallpapered.
Doors can have three complete sets:
- Cloth. In this case, the purchase of the box and consumables is done separately. That is, you can buy a tree and build from it the necessary door frame. Standard boxes are also available. They must exactly enter the opening.
- Cloth with a box. In this case, all the structural elements are selected under the opening, but are in disassembled form. Their assembly can be done independently or with the help of masters.
- Door block. Entrance doors are completely assembled, it remains only to securely secure them in the doorway.
Any of the options is chosen by the owner of the apartment, based on personal preferences. It is worth noting that the cost of them is also different.
Calculation and size of the box
Dimensions of standard doors differ from country to country.
The size of the box is calculated by the regulatory documentation and depends on the type of premises:
- In the kitchen - 2 x 0.7 m;
- In the bathroom - 2 x 0.6 m;
- In the living room - 2 x 1.2 m.
However, not always such structures are installed, since after construction works openings can change their size. To order a door of the right size, measure the opening, and take a smaller standard value. Before carrying out the measurements, you should inspect the door opening for defects and perform this procedure after correcting them.
An important parameter is the depth of the box. It should have a value of 80 cm. In some houses the thickness of the walls may be greater. In this case, the box is installed flush with the wall, and the remaining gaps are closed.
Beginning of work
Before installing the box it is necessary to assemble it in a single unit. The process is performed on the floor. Vertical and horizontal elements connect with each other. Next, check for irregularities and work with sandpaper.
Assembling the door box
This process is performed using self-tapping screws. It all depends on how the corners of the slats are located. If at an angle of 45º, then the holes for the screws are drilled diagonally and the bar is twisted with a horizontal bar.
Much easier if the corners in the box have 90 degrees. But for the reliability of the hole still drill. Such properties have a box of MDF.
The upper bar is applied to the side, then the edges are leveled and two holes are made for self-tapping screws. To date, the lower horizontal bar is not used, which greatly simplifies the work. The assembled wooden door frames should be checked for gaps so that the elements can be freely opened and closed. If they are, then the assembly is correct.
As stated earlier, the vertical bars are made a bit larger.
Installing loops
On light wooden doors there should be two loops. One is located at the top, the other - at the bottom. If the doors are heavy, then a third one is installed strictly in the middle. Embedding loops is performed on the floor. Its a prerequisite is that the pin should look up. Using a chisel on the beams and on the door, special notches are made, into which the hinges are inserted. The clearance between the door and the side stand must be at least 4 mm.
Installation of a finished box
The assembled door frame, which forms the letter "P", is set according to the level in the opening. It is fixed using spacers. The level is constantly used. Comfortable use of the door depends on how it will be exposed. Therefore, this procedure requires special attention.
Further, the fastening elements are selected. Depending on the material of the wall, you can choose self-tapping screws or large dowels. Fastening for the door frame is done in several places. The distance between them should be about 30 cm, that is, 7 self-tapping screws or dowels are installed on the vertical bars, and 3 pieces on the horizontal bars. In the door box holes are drilled for self-tapping screws. Moreover, the size of the drill must be smaller than the size of the cap.
Much more difficult to do, if the wall is made of bricks or other solid elements. It is already necessary to perform the installation of door frames with dowels. Their installation is particularly difficult, since the dowel must enter the brick block, and not into the seams. Here it is necessary to work with a drill with a diameter of more than 4 mm. And do it so that there are no traces left on the wall. Next, remove the door frame and check what place the drill got into.
The next step is to install the door leaf. On the already inserted pins, located at the top, doors are hung. Further check the functioning of the door. It should open and close freely. After that, all gaps are filled with mounting foam.
Fixation with foam
The installation of door frames ends with its secure attachment. To do this, check the fixation of the structure. The sealing material is placed in the formed slots. As it can serve as a cardboard. The door closes and the spacers are installed, so that it does not arch in different directions.
Next, take the balloon with mounting foam and fill the gap.
Conclusion
The installation of the door frame can be carried out independently.