BusinessIndustry

Septic for the House

The erection of the mansion is a rather complicated task. If I'm asked if I can go through this again, I say that I am ready now, because the experience is very extensive, and the second construction will be much faster. In general, it's difficult to start, then everything is easier. Only, as practice shows, some are afraid to start, because they do not know where to start. I tell my story. In the end, I was able to start building my own townhouse. Then, when the project plan was ready and approved, I started to implement it. In the very beginning it was necessary to make drilling. Frankly, I did not quite understand why this was necessary, only the architect developing the project convinced me of their necessity to achieve the most solid foundation of the mansion. Drilling wells under poles took several weeks, but preparatory stages were not completed on this. At this stage of erection, I immediately told my assistant that I did not want to be dependent on the centralized water supply. Then he gave a recommendation to drill holes to provide a country house, watering the garden with constantly available free water. The idea was to my liking, in spite of the fact that the drilling of the hole was not initially indicated in the design plan. Only now I understand what I did right. Well construction is a regular event, since there are distant villages in the region, in which there is no centralized water supply. But the owners of private expensive real estate often use these services.
When I started the project, I was very worried about the topic of the lack of centralized water disposal. Ordinary cesspool, of course, a multifunctional solution, but from the point of view of hygiene, environmental and epidemiological security, is not entirely correct. The water supply network was realized on the basis of connection to the well. In the search for a solution, I came across a septic system, which makes it possible to clear the sewage. The septic mechanism for the cottage seemed to be a safe solution to this difficult situation. The acquisition of the septic was not difficult, now it was necessary to understand the details of its installation. I decided not to risk it, and I turned for help to a specialized company that had not only a suitable technique, but also a qualification. To mount a septic tank for the house, it took several hours, much more time was required for the installation of the system itself: installation of valves, installation of filters, network connection and the rest. At the same time, I was now convinced that I had decided to arrange water supply. The water supply system was ready, and now I could concentrate on building the house. I want to make a little emphasis on the fact that without the Yamogor all the work would take a lot of time. Dreaming to save on this I want to say that digging all the necessary pits manually will be much more expensive than a mechanized method. Without the service drill for the holes, in fact, it will not work to drill a hole of the required length.
In general, the service of the Yamogor cost me not so much, as I planned all the works ahead of time and managed to meet one day.

Similar articles

 

 

 

 

Trending Now

 

 

 

 

Newest

Copyright © 2018 en.delachieve.com. Theme powered by WordPress.